Photo 1
Submit a request

New 2-bedroom flat in Nicosia № 217331

217331
https://dom.com.cy/upload/uf/cc2/48bx8vmlszc6np4mnu5s31bzzy4qitbx.jpeg
Additional:
New building
Parking
Storage
Elevator
Description:

A modern apartment for sale in Strovolos, Nicosia is a great option for a comfortable stay or a profitable investment. The apartments are made using modern technologies and high-quality materials that ensure a high level of comfort and energy efficiency. The apartment provides preparation for the installation of split air conditioning systems in all rooms. The project complies with energy efficiency class A, which guarantees lower energy costs and a comfortable stay. A photovoltaic system is provided for the common areas of the building, and a 1.5 kW photovoltaic system is included for all two-bedroom apartments. Additionally, it provides preparation for a underfloor heating system, providing additional comfort at any time of the year.

Read more
Object
№217331
Type:
Apartment
City:
District:
Complex:
Developer:
Bedrooms:
2
Bathrooms:
2
Total area:
88 m2
Indoor area:
78 m2
Storey:
3
Floor:
2
Year of construction:
12/2027
Energy efficiency class:
A
209 000 EUR + VAT
2 375 EUR/m2
2026-10-19T13:12
217331
Schedule a viewing
Similar offers
9875 objects Show all
https://dom.com.cy/upload/uf/f1d/c692y57ma3ufhs0e7c9jty63rp5tbinq.jpeg
№ 238193
Total area: 127 m2
Bedrooms: 2
240 000 EUR+VAT
1 890 EUR/m2
https://dom.com.cy/upload/uf/27e/9x5qkvopt0107fmm16sl0gtyjux4jm8o.JPG
№ 238191
Total area: 127 m2
Bedrooms: 2
240 000 EUR+VAT
1 890 EUR/m2
https://dom.com.cy/upload/uf/73d/xtmeruz9z52pp5uskinodkuxb5i9yecz.JPG
№ 238185
Total area: 92 m2
Bedrooms: 2
210 000 EUR+VAT
2 283 EUR/m2
https://dom.com.cy/upload/uf/e7e/by5siwsj1ffj2zw9xgazfqtecesofc3j.jpg
№ 238167
Total area: 92 m2
Bedrooms: 2
210 000 EUR+VAT
2 283 EUR/m2
Previous viewed objects
https://dom.com.cy/upload/resize_cache/uf/a85/1088_820_2/43450tb6h2mmabvfsxw66sjdga7mvizi.jpg
№ 233815
Total area: 132 m2
Bedrooms: 3
295 000 EUR+VAT
2 235 EUR/m2