DOM Real Estate

New 1-bedroom penthouse in Larnaca / Livadia №233003

Property image 1
Property image 2
Property image 3

Additional:

Elevator
Parking
Pool
Storage room

Description:

For sale a modern penthouse with a spacious roof terrace in a new residential complex in Livadia, Larnaca. The residential complex is located in a quiet and sought-after area, just a few minutes drive from the coast and the center of Larnaca. The project combines modern architecture, comfort and landscaped grounds. The complex consists of two identical buildings located symmetrically opposite each other. In the center of the complex there is a communal swimming pool, which is the main architectural element of the project. This solution creates an atmosphere of harmony, balance and privacy. There are also relaxation areas by the pool and a separate BBQ area. The buildings are equipped with a certified thermal insulation system with a thickness of 8 cm on all exterior walls. The water supply system is made using "Pipe in Pipe" technology using pipes from 16 to 25 mm in diameter. A full-fledged photovoltaic system is provided for the common areas of the complex, which helps to increase the energy efficiency of the building. The penthouse is perfect for your own living, as well as for renting or long-term investment. Due to its convenient location, modern architecture and quality of construction, this facility represents an attractive opportunity for a comfortable life and investment in Larnaca.

Object

№233003

Type:

Apartment

City:

District:

Complex:

Developer:
Bedrooms count:

1

Bathrooms:

1

Total area:

113 m²

Living area:

52 m²

Floor:

3

Floors:

3

Construction year:

03/2028

Distance to sea:

1640 m

Energy class:

A

€195,000+ VAT

€1,726 / m²

DOM Real Estate

DOM Real Estate

+35724023513