Reading time
1 min
Views
681
Added
22.08.2025
Updated
23 August 2025

The municipal swimming pool in Nicosia continues to be modernized

The municipal swimming pool in Nicosia continues its large-scale renovation program. After refurbishing the outdoor areas and pool basins, the interior and engineering systems are next. The work includes completely refurbishing the building, dismantling outdated structures, and installing modern equipment aimed at improving energy efficiency.

Project budget and sources of funding

The Nicosia Municipality has announced a tender for the new phase of work, which has a budget of €1.9 million, excluding VAT. Funding will come from the EU Recovery and Resilience Fund, which highlights the project's strategic importance to the city. The renovation is scheduled for completion by summer 2026.

Why was the pool closed?

Popular with the capital's residents, the pool, known as Lellos Pool, was closed in September 2021 due to the need for major repairs. During this time, the exterior and pool basins were renovated. Now, it is time for a thorough interior renovation, without which the facility cannot operate.

Муниципальный бассейн Никосии продолжают модернизировать

Large-scale work inside the building

According to the tender documents, the project involves completely renovating the interiors while preserving the load-bearing structures. The metal roof in the courtyard will be dismantled, and the partitions, sanitary facilities, and outdated engineering systems will be removed. All floor and wall coverings will be replaced, and a new panoramic elevator will replace the old staircase.

Special attention will be given to modernizing the engineering networks. The building will be completely cleared of old electrical and mechanical installations. Then, modern, energy-efficient systems will be installed. Renovating the roof coverings and insulating the facades is also planned, which will significantly reduce maintenance costs.

Significance of the Project for Nicosia

The municipality emphasizes that the renovation of the swimming pool is important not only for sports, but also for social reasons. The renovated complex will serve as a center for swimming, training, and competitions, as well as a place for Nicosia residents to relax.

As the demand for sports infrastructure in Cyprus grows, the renovated municipal swimming pool is poised to become a model for modern urban facilities, combining energy efficiency, accessibility, and comfort for all visitors. After a break of almost four years, Nicosia will have a modern, European-standard sports facility ready to welcome thousands of city residents and visitors.

Source: In- cyprus
Photos: pixabay.com, DOM

Detailed information about all projects and developers in Nicosia can be obtained from the specialists at the number one real estate agency in Cyprus, DOM, by phone at +357 22 008 359, or in person at the address: Archiepiskopou Makariou III 1, Lakatamia 2324, Nicosia, Cyprus.

Add a comment
Leave a comment
Компания «Dom Real Estate» Контакты:
Адрес: Limassol, Cyprus,
Телефон:+357 25 212 212, Электронная почта: info@dom.com.cy